Friday, May 31, 2019
pipeline
Thankfully we were able to do a lot of the work ourselves, on a lot of the projects that needed to get done. But we did have to hire some help in getting the pipeline set up just right. It needs to be at a certain slope for the milk to work with the suction and the milk to flow properly to the holding tank, to then go into the bulk tank.
I know nothing of this type of work, but I can hold things and be the "gofer" you know, go for this and go for that! LOL And it was time I got to spend with my husband. We kinda like each other. And being able to work together in all this new adventure we were on was fun.
A little out of order, but none the less the pipeline went in
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment